Thomson Rossi
origin energy control room
Upgrade to the 'B' Station Control Room at Torrens Island Power Station involved the integration of new computer technology into specially designed Control Desks. Allowing a full range of flexibility in the use of monitors and keyboards, the new installations allowed redundant technical equipment to be removed whilst a new lighting system was installed to reduce glare and improve illumination levels.